• Overtourism
  • Keep Victoria Falls Wild - Railway Loop

    Keep Victoria Falls Wild

    Current Threats




    Victoria Falls City Council (Zimbabwe)

    Railway Loop




    Railway Loop Developments

    New Developments (March 2025)

    Explorers Village Expansion (2026)

    Wildlife Corridor




    Railway Loop (2024)


    The 2024 Victoria Falls City Council Master Plan 'preferred option' map (VFCC, November 2024) also indicates an expanded development zone within the area known as the Railway Loop, again identified as 'restricted permanently' from development under the 1975 Outline Plan (and identified as Area 12 under the 2001 Combination Plan).


    Victoria Falls railway and road loop developments

    Image showing recent developments within Railway Loop area (Adapted from VFCC, 2024)
    [click image for larger view].


    This development area, originally limited within the Victoria Falls Railway Reserve and later transferred to Council control has expanded steadily over the years, with the development of the curios shops and markets in the 1960s, establishment of the Elephant Walk Shopping and Artists Village in 1997 and most recently the Shearwater Explorer's Village, opened in December 2016.


    New Developments (March 2025)


    In March it was announced that the City Council had signed a US$1.6 million agreement with a construction company to develop services infrastructure (water, sewer and storm-water systems) for 20 new commercial stands within the Railway Loop, marking a further step in the expansion of the City’s footprint into an area previously ‘permanently’ protected from development (Victoria Falls Bits and Blogs, 11th March 2025).


    Explorers Village Expansion (2026)


    In early February 2026 Shearwater announced on social media the expansion of their Shearwater Explorers Village with the development of an additional 26 deluxe guest rooms and 8 comfortable guide rooms, opening June. The expansion increases the total number of rooms to 130 (260 beds), plus additional services camping.

    The expansion, within the area of the Railway Loop and restricted permanently from new development under the 1975 Outline Plan (identified as area 12 under the 2001 Combination Plan), was not notified to UNESCO (the site is within the 500m Buffer Zone surrounding the site).


    Shearwater Explorer's Village expansion 2026

    Shearwater Explorers Village expansion, 2026


    Wildlife Corridor


    The Victoria Falls City Council 2024 Council Master Plan Draft Report of Study (VFCC, April 2024) identified this area as one of three key wildlife movement corridors (Corridor 2).

    The Report further clarified in several additional statements that development pressures were directly impacting on wildlife movement with implications for human-wildlife conflict and emphasised the need to recognise and respect wildlife corridors in reducing people-wildlife conflict.

    “Tourism and residential developments are affecting wildlife corridors and dispersal areas and this has a knock-on effect with human-wildlife conflict.” (VFCC, April 2024, p.155)

    “As restrictions of wildlife movement increase the potential for human-wildlife conflict increases significantly.” (VFCC, April 2024, p.91)

    “Need for Management of Wildlife and Human conflict - the Master Plan must recognise and accommodate wildlife corridors.” (VFCC, April 2024, p.204)

    The 2024 Victoria Falls City Council Master Plan 'prefered option' map (VFCC, November 2024a) shows an expansion of the tourism development zone within this area.


    Victoria Falls railway and road loop developments

    Map showing expanded development area within Railway Loop (Adapted from VFCC, 2024)
    [click image for larger view].


    The Council's plans to develop this area, together with riverside tourism stands (such as the Victoria Falls Resort proposal, 'Stand 1815', the Big Tree Area and Road Loop), combined with National Park plans to develop the Elephant Hills riverine fringe for tourism under the Six Senses 'tree lodge' proposal, appear to be in direct conflict with the warnings and recommendations in the Council's own Report. Development of these areas can be predicted to lead to significant displacement of local elephants from traditional refuge areas and movement corridors, with a corresponding increase in people-wildlife conflict on both sides of the river the most likely consequence.


    Area of the Railway Loop

    Area of the Railway Loop (2025)
    [click image for larger view].





    Google maps: - (external link, opens in a new window).




    References


    Links to external sites or pdf downloads, open in a new window.


    Victoria Falls City Council (April 2024) Victoria Falls City Master Plan. Draft Report of Study. April 2024. (pdf download [34.3 mb], opens in a new window).

    Victoria Falls City Council (November 2024) Victoria Falls City Master Plan. Written Statement. June 2024. (pdf download, opens in a new window). With Main Map (Preferred Option VF/MP/01, undated) and Supporting Map VF/MP/02 (undated) (insert section)