Keep Victoria Falls Wild

Existing Developments




Victoria Falls City Council (Zimbabwe)

Rest Camp




Rest Camp

Civic Centre Plans (2016)

Grand Designs (2017)

US$250m Pricetag (2021)

Council Master Plan (2024)




Rest Camp


The central Victoria Falls Rest Camp originally developed in the 1940s by the Commission for the Preservation of Natural and Historical Monuments and Relics, then conservators of the Victoria Falls Reserve. Prior to this an area near the Big Tree had been used as a camp site area.

Management of the camp was transferred over to the management of the National Park Authority following the establishment of the Victoria Falls National Park in 1951. The Rest Camp, then within the boundaries of the 'greater' National Park, would quickly grow to offer 30 self-catering chalets, caravan park and camping areas, set amongst shaded gardens.

Following the division of the greater Victoria Falls National Park and allocation of expanded Council-controlled area in 1974 the Rest Camp (and upstream Zambezi Camp and Caravan Site) were taken under the Council’s management.

Management of the Rest Camp, together with the upstream Zambezi Camp, was leased to the Spencer's Creek/Ilala Hospitality Group in the early 2000s.


Victoria Falls Frontline

The 'frontline' of development towards the Falls (2025) [click for larger view]


Civic Centre Plans (2016)


In mid-2016 Victoria Falls Municipality announced plans to develop a Civic Centre, shopping mall, convention centre, five-star hotel and theme park in the centre of Victoria Falls, redeveloping the substantial plots currently home to the Falls Rest Camp and Municipality offices. In September 2016 it was reported that a Memorandum of Understanding had been signed with a South African developer and a local construction company to develop plans for the multi-million dollar complex.

“The local authority has engaged Manyara and Associates, a local contractor as well as Mud Hut of South Africa for the ambitious project: a civic centre, a five-star hotel, a shopping mall, convention centre and a hospital facility among other structures.” (Victoria Falls Bits and Blogs, 15th September 2016)

The development threatens a significant area of green space within the town, with extensive grounds and many fine tree specimens under threat of being ripped up and replaced with concrete buildings and parking lots.


Grand Designs (2017)


In 2017 Pantic Architects Ltd published concept designs for the redevelopment (Pantic Architects, 2017)


Victoria Falls Rest Camp redevelopment


Victoria Falls Rest Camp redevelopment

Concept designs for the Rest Camp redevelopment (2018) [click for larger view]


Victoria Falls Rest Camp redevelopment


Victoria Falls Rest Camp redevelopment

Concept designs for the Conference Centre (2018) [click for larger view]


Victoria Falls Rest Camp redevelopment


Victoria Falls Rest Camp redevelopment

Concept designs for the Hotel development (2018) [click for larger view]


US$250m Pricetag (2021)


In 2021 it was announced that US$250m was needed for civic centre construction.

“The Victoria Falls City Council requires about US$250 million to construct a civic centre in the model of the Mandela Square in Johannesburg, South Africa. Victoria Falls was conferred city status last December and has intensified plans to construct a civic centre. The structure will have council offices, a hall for meetings and functions, a five-star hotel, a shopping mall with restaurants and a theme park or city square. The facility will be developed on the piece of land where the council offices are located and stretch across Rest Camp.” (Victoria Falls Bits and Blogs, 12th March 2021)


Council Master Plan (2024)


The 2024 Victoria Falls City Council Master Plan Draft Report of Study highlighted details from the Rest Camp Local Subject Plan and indicated a revised development scheme:

The area covered by this plan is located in the heart of Victoria Falls’ existing retail cluster, adjacent to the railway line and two main roads, Livingstone Way and Parkway Drive. The site currently consists of two properties: Stands 1415 and 412.

"The development proposals are:

• Creating a well-planned city centre for Victoria Falls with a unique image and character.

• Optimizing land use to meet the present and future needs of the planning area.

• Rationally zoning and designating land for various land-use categories.

• Protecting the natural environment and ensuring the conservation of the city’s natural resources. (VFCC April 2024, p.177)


Victoria Falls Rest Camp redevelopment

(VFVV April 2024) [click for larger view]





Operated/managed by: The Spencer’s Creek/Ilala Hotel Group.

Operator website: Rest Camp (external link, opens in a new window).

Google maps: - (external link, opens in a new window).





References


Roberts, P. (2025) Footsteps Through Time - A History of Travel and Tourism to the Victoria Falls. Second Edition. Zambezi Book Company / CreateSpace Independent Publishing. (First published 2017, fourth edition July 2025).

Victoria Falls Bits and Blogs (15th September 2016) Multi-million dollar complex for Vic Falls?.

Victoria Falls Bits and Blogs (3rd March 2021) Zimparks campsites project faces resistance.

Victoria Falls Bits and Blogs (12th March 2021) US$250m needed for civic centre construction.

Victoria Falls City Council (April 2024) Victoria Falls City Master Plan. Draft Report of Study. April 2024. (pdf download [34.3 mb], opens in a new window).